I-18-4430 - Roadway & Bridge Reconstruction

The work under this Contract shall consist of: The reconstruction of portions of I-294 mainline, bridge replacement of bridge number 191 carrying northbound I-294 over CNRR, I&M Canal, Chicago Sanitary & Ship Canal, MWRD Property, Cook County Forrest Preserve, Des Plaines River, BNSF RR, Santa Fe Drive, and the 75th Street Ramps, replacement of portions of bridge numbers 183 and 184 carrying I-294 over LaGrange Road, reconstruction of portions of the 75th Street ramps, performance based noise and retaining walls, cofferdams and causeways, detention pond and other drainage improvements, temporary soil retention, fire protection system, demolition of structures, protective shield, temporary erosion and sediment control, and Maintenance of Traffic
  Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 2.3 MB
  Addendum #2 (click to expand/collapse)
Name Size
Addendum #2 21.7 MB