RR-19-4451 - Pavement & Structural Preservation & Rehabilitation

The work under this Contract shall consist of: Rehabilitation of existing mainline and ramp pavements as defined by the Illinois Tollway, Structure rehabilitation, Installation of guardrail, Regrading and shaping of ditches, Miscellaneous sign truss repairs, Pipe cured-in-place lining, Landscape and soil erosion/sedimentation control measures, topsoil and seeding, Pavement markings, delineators and signage installation/relocation, Maintenance of traffic.

Status

Accepting Bids

Prebid Date2/28/19 11:00 am

Bid Date3/22/19 10:30 am

Company & Contacts

Illinois Tollway

Mohamad Faraj (mfaraj@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: Reagan Memorial Tollway (I-88) between Mile Post 113.6 and Mile Post 123.9 in DuPage County and Kane County, Illinois

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention Mohamad Faraj at mfaraj@getipass.com, to be received no later than 2:00 p.m. local time on March 11, 2019.

BID DUE DATE:
Friday, March 22, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Thursday, February 28, 2019 – 11:00AM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence