RR-19-4455 - Grading, Erosion Control & Sluice Gate Path

The work under this Contract shall consist of: Install Revetment Mat in Ditch Line / Regrade Existing Access Path, Seeding, Erosion and Sediment Control, Maintenance of Existing Bioswale on West Side of I-294, and Weed Control

Status

Accepting Bids

Prebid Date3/11/19 1:00 pm

Bid Date3/26/19 10:30 am

Company & Contacts

Illinois Tollway

Michael Brink (mbrink@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: The Tri-State Tollway (I-294) between Mile Post 44.3 (Dempster Street) to Mile Post 44.6 (Ballard Road) in Cook County, Illinois

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention Michasel Brink at mbrink@getipass.com, to be received no later than 2:00 p.m. local time on March 12, 2019.

BID DUE DATE:
Tuesday, March 26, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Monday, March 11, 2019 – 1:00PM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence