RR-18-4448 - Misc. Drainage & Environmental Repairs & Improvements - I-90

The work under this Contract shall consist of but is not limited to: Grading, stabilization and protection of eroded slopes; Removal of damaged concrete channel lining; Installation of articulated concrete block revetment matting; Riprap placement to prevent future erosion of slopes and ditches; Repair / resetting of culvert end sections; Cleaning existing drainage structures; Remove damaged concrete ditch at headwall outfall; Repair / Restoration of bioswales; and Restoration of aggregate shoulders.

Status

Accepting Bids

Prebid Date3/22/19 1:30 pm

Bid Date4/2/19 10:30 am

Company & Contacts

Illinois Tollway

Brett Bilina (bbilina@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on the Jane Addams Memorial Tollway between Mile Post 15.90 and Mile Post 54.70 in Kane, Winnebago, and Boone, Counties, Illinois.

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention: Brett Bilina at BBilina@getipass.com, to be received no later than 2:00 p.m. local time on March 25, 2019.

BID DUE DATE:
Tuesday, April 2, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Friday, March 22, 2019 – 1:30PM
Illinois Tollway – Central Administration Building
Engineering Conference Room 175-Court Room
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence