RR-19-4474 - Pavement & Structure Reconstruction & Rehabilitation

The work under this Contract shall consist of: Roadway rehabilitation and reconstruction; structural rehabilitation of Indian Creek Culvert, Eola Road Bridge and EJ&E Railroad Bridge; structural removal of the Illinois Prairie Path Bridges; installation of the Illinois Prairie path 3-sided precast pedestrian structure; drainage improvements; landscape and erosion and sediment control measures; roadside safety improvements; signing improvements; pavement markings; lighting; maintenance of traffic and all other appurtenant and miscellaneous construction

Status

Accepting Bids

Prebid Date10/1/19 10:00 am

Bid Date10/24/19 10:30 am

Company & Contacts

Illinois Tollway

Mohamad Faraj (mfaraj@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: Reagan Memorial Tollway between Mile Post 118.06 to Mile Post 123.46 in DuPage and Kane Counties, Illinois

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention Mohamad Faraj at mfaraj@getipass.com, to be received no later than 2:00 p.m. local time on October 14, 2019.

BID DUE DATE:
Thursday, October 24, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Tuesday, October 1, 2019 – 10:00AM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence