RR-19-4474 - Pavement & Structure Reconstruction & Rehabilitation

The work under this Contract shall consist of: Roadway rehabilitation and reconstruction; structural rehabilitation of Indian Creek Culvert, Eola Road Bridge and EJ&E Railroad Bridge; structural removal of the Illinois Prairie Path Bridges; installation of the Illinois Prairie path 3-sided precast pedestrian structure; drainage improvements; landscape and erosion and sediment control measures; roadside safety improvements; signing improvements; pavement markings; lighting; maintenance of traffic and all other appurtenant and miscellaneous construction
  01_Plans (click to expand/collapse)
  02_As Builts (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
ABS_WOOD_WPM_4474-SN817C-AsBuilts_09242019 620.7 KB
ABS_WOOD_WPM_4474-SN819-AsBuilts_09242019 7.0 MB
ABS_WOOD_WPM_4474-SN821-AsBuilts_09242019 8.5 MB
ABS_WOOD_WPM_4474-SN823-824-AsBuilts_09242019 9.6 MB