I-19-4464 - Roadway & Bridge Widening, Ramp Construction & Toll Plaza

The work under this Contract shall consist of: Widening I-57, Reconstruction of I-57 bridges over 147th Street, new CD Road Bridges over 149th, 147th and Dixie Highway, construction of CD Roads A and C, Ramp H associated drainage, signage and pavement markings and delineation, traffic barriers, maintenance of traffic, erosion and sediment control, installing surveillance systems and restoration of landscaping

Status

Accepting Bids

Prebid Date10/10/19 1:00 pm

Bid Date11/5/19 10:30 am

Company & Contacts

Illinois Tollway

Alfred Pebler (apebler@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 7.0 and Mile Post 8.5 and along Interstate 57 (IDOT Jurisdiction), between Mile Post 349.2 and Mile Post 350.6 in Cook County, Illinois.

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention apebler@getipass.com, to be received no later than 2:00 p.m. local time on October 18, 2019

BID DUE DATE:
Tuesday, November 5, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Thursday, October 10, 2019 – 1:00PM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence