I-19-4490 - Flagg Creek Water Reclamation District Sanitary Sewer Relocations

Status

Accepting Bids

Prebid Date11/21/19 1:00 pm

Bid Date12/10/19 10:30 am

Company & Contacts

Illinois Tollway

Jeffrey Allen (jallen@getipass.com)   630-241-6800

Location

The improvements to be constructed under this Contract I-19-4490 shall be performed along the Tri-State (I-294) Tollway between Mile Post 24.0 and Mile Post 25.5, and between Mile Post 26.5 and Mile Post 27.3, in Cook County, Illinois

The work under this contract includes, but is not limited to: relocation of portions of the Flagg Creek Water Reclamation District (FCWRD) sanitary sewers along I-294, between Mile Post 24.0 and Mile Post 25.5, and between Mile Post 26.5 and Mile Post 27.3, including installation of new storm and sanitary sewers, manholes, and junction chambers; jacking of proposed sewers; removal and/or abandonment of existing sewers and manholes; removal and replacement of shoulders as necessary; mainline pavement patching as necessary; drainage improvements; permanent and temporary erosion control measures; noise abatement wall removal and replacement; retaining wall and noise wall construction; pavement marking and signing; ITS and lighting; culvert extension; guardrail installation and, wall construction; pavement marking and signing; ITS and lighting; culvert extension; guardrail installation and,
maintenance of traffic.

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention jallen@getipass.com, to be received no later than 2:00 p.m. local time on December 3, 2019.

BID DUE DATE:
Tuesday, December 10, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Thursday, November 21, 2019 – 1:00PM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence