I-18-4352 - Windsor Drive Bridge Replacement

The work under this Contract shall consist of: Complete removal of existing four span bridge and replace with two span bridge at Windsor Drive over the Tollway Connector Ramps M & N between I-88 & I-294, pavement removal, roadway pavement construction, grading & earth embankment, erosion control & landscaping, lighting, associated maintenance of traffic, and all other appurtenant and miscellaneous construction shown on the plans and as required by the Standard Specification and within Special Provisions
  01_Plans (click to expand/collapse)
Name Size
I-18-4352_ContractPlans_Vol1 37.0 MB