I-16-4274 - Illinois Route 47 Interchange

The work under this Contract shall consist of: construction of 3 ramps and reconstruction of 2 ramps at I-88/IL Route 47 interchange; bridge deck overlay and slope wall modification of IL Route 47 bridge over I-88; roadway lighting installation; earthwork; erosion control; signing; Toll plazas, drainage improvements and other miscellaneous work.

Status

Accepting Bids

Prebid Date10/26/18 10:00 am

Bid Date11/20/18 10:30 am

Company & Contacts

Illinois Tollway

Laura Thompson (lthompson@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: Reagan Memorial Tollway (I-88) Illinois Route 47 Interchange between Mile Post 108.8 to Mile Post 109.9 in Kane County, Illinois

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention Laura Thompson at lthompson@getipass.com, to be received no later than 2:00 p.m. local time on November 6, 2018

BID DUE DATE:
Tuesday, November 20, 2018 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Friday, October 26, 2018 – 10:00AM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence