Bids due in 10 days
4/7/20 10:30 am
I-19-4499 - Grading & Drainage Improvements
Illinois Tollway
The location of services to be performed on the Tri-State Tollway (I-294) Ramp AB from I-294 SB to I-55 NB/SB at Mile Post 23.75 in Cook County, Illinois.
The scope of work shall consist of aggregate access road construction, site clearing and grading, drainage improvements, shoulder rehabilitation, guardrail improvement, and all ancillary work
Bids due in 3 days
3/31/20 10:30 am
I-19-4506 - Shoulder Rehabilitation & Traffic Crossover Construction
Illinois Tollway
The location of work to be performed is on the Tri-State Tollway (I-294) between Mile Post 17.8 and Mile Post 20.7 in Cook County, Illinois (Cook)
The scope of work shall consist of the following: shoulder rehabilitation and crossover construction for work in advance of the mainline contract
Bids due in 5 days
4/2/20 10:30 am
I-19-4508 - Procurement of Temporary Highway Lighting Materials
Illinois Tollway
The work under this contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 17.8 to Mile Post 20.9 in Cook County, Illinois.
The work under this contract shall consist of: Procure, manage, and store temporary lighting poles, mast arms, and luminaires for future construction contracts 4517, 4518, and 4496 for Tri-State Tollway (I-294) improvements
Bids due in 5 days
4/2/20 10:30 am
I-19-4712 - Advance Earthwork, Drainage Construction & Railroad Spur Grading
Illinois Tollway
The location of work to be performed is on the Western Access Tollway (I-490) between Mile Post 00.10 and Mile Post 00.35 in Cook County, Illinois; and Green Street between County Line Road and Western Access Tollway (I-490) in Cook & DuPage Counties
The work under this contract shall consist of: Union Pacific Railroad (UPRR) Utility Crossings; Canadian Pacific Railway (CPR) Industry Track Relocation; Grading and drainage for Green Street Properties (north of Franklin Avenue, west of UPRR); Grading for I-490; Maintenance of traffic operations for local roads; Erosion control measures and fencing for all properties included in the Contract; and Protection of existing utilities within the construction zones
Bids due in 6 days
4/3/20 10:30 am
I-20-4512 - Advance Fiber Relocation Installation
Illinois Tollway
The location of work to be performed is on the Tri-State Tollway (I-294) between Mile Post 32.90 and Mile Post 36.30 in Cook County, Illinois. (Cook)
The work under this contract shall consist of: Installing dry jack and bored steel casing under Union Pacific Railroad; Installing underground conduit duct bank; Proofing existing underground conduit duct bank; Installing fiber optic cables; Connecting existing temporary ITS devices to proposed fiber optic cable; Maintenance of existing ITS devices; Removing existing ITS devices; Erosion control; and Maintenance of Traffic.