Public Bids

As-Read Bid Results
Illinois Tollway
Please click on the "Specs" tab to view and download the As-Read Bid Results
Bid Tabulations
Illinois Tollway
Bids due in 39 days
1/7/22 10:30am
I-21-4594 - Roadway & Bridge Construction
Bids due in 39 days
Illinois Tollway
The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 19.88 and Mile Post 20.06 in Cook County
The work under this contract includes earthwork, grading, bridge widening, pavement construction, retaining wall construction, drainage, erosion and sediment control, roadside safety barriers, pavement marking, lighting, maintenance of traffic, and other miscellaneous work
Bids due in 10 days
12/9/21 10:30am
I-21-4597 - Water Main Construction at Mile Long Bridge
Bids due in 10 days
Illinois Tollway
The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 21.1 and Mile Post 21.9 in Cook County, Illinois
The work under this Contract includes, but is not limited to: Water main and fire hydrant construction; Pavement removal and pavement patching; guardrail removal and replacement; Maintenance of traffic during construction; Temporary erosion and sediment control; Landscaping; Utility protection;, and all other appurtenant and miscellaneous construction shown on the Plans and as required by the Standard Specifications and the Special Provisions
ROCIP Insurance Manual & FAQ
Illinois Tollway
Bids due in 18 days
12/17/21 10:30am
RR-21-4816 - Landscape Planting Improvements
Bids due in 18 days
Illinois Tollway
The location of the services to be performed for this contract is the Veterans Memorial Tollway (I-355) between Mile Post 12.0 and Mile Post 19.25 in DuPage County, Illinois
The work under this Contract includes, but is not limited to: Planting of balled and burlapped and container grown, trees and shrubs, maintenance and monitoring of installed trees and shrubs during the planting and extended establishment period, seeding and interseeding, mowing for interseeding preparation and maintenance mowing, tree and shrub removal, weed control, pruning and mulching existing trees and shrubs, erosion and sediment control, and maintenance of traffic operations
Bids due in 46 days
1/14/22 10:30am
RR-21-4819 - Pavement & Shoulder Rehabilitation Flagg Creek to Cermak Rd
Bids due in 46 days
Illinois Tollway
The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 23.8 and Mile Post 29.2 in DuPage County and Cook County, Illinois.
The work under this contract includes but is not limited to resurfacing of the southbound lanes, partial depth patching of the northbound lanes, resurfacing of the northbound and southbound median and outside shoulders, median crossover construction, drainage improvements, guardrail modifications, temporary lighting, temporary ITS, pavement markings, maintenance of traffic, and all other appurtenant and miscellaneous construction shown on the plans.
Bids due in 18 days
12/17/21 10:30am
RR-21-4821 - Pavement Repairs
Bids due in 18 days
Illinois Tollway
The improvements to be constructed under this contract shall be performed along the Tri-State Tollway (I-294) from M.P. 23.1 to M.P. 39.8 and Systemwide
The scope of the work shall consist of intermittent concrete and asphalt pavement repairs, removal and replacement of raised pavement reflectors, longitudinal joint repairs, pavement marking, various crack cleaning and filling, crack routing and sealing and maintenance of traffic
Bids due in 46 days
1/14/22 10:30am
RR-21-4822 - Structural Rehabilitation
Bids due in 46 days
Illinois Tollway
The location of the services to be performed for this contract is the Tri-State Tollway (I-294) at M.P. 40.8 and Illinois Route 390 Tollway (IL 390) between M.P. 7.14 and M.P. 15.27 in Cook and DuPage County, Illinois
The work under this contract includes bridge floor beam repairs and steel connection retrofits, and bridge expansion joint repairs and replacements
Bids due in 15 days
12/14/21 10:30am
RR-21-4824 - System Roadway Appurtenance Repairs - Systemwide
Bids due in 15 days
Illinois Tollway
The location of the services to be performed for this contract is Systemwide.
The improvements to be constructed under this contract shall be performed on an as needed, on-call basis at various locations on the Illinois Tollway System. Task orders will be issued for work to include: guardrail repair or replacement, including traffic barrier terminals; high-tension cable median barrier repair or replacement; attenuator replacement; and maintenance of traffic