Public Projects
Sort by
Project Name
As-Read Bid Results
Illinois Tollway
Please click on the "Specs" tab to view and download the As-Read Bid Results
Bid Tabulations
Illinois Tollway
Bids Due in 11 days
6/27/25 10:30am CDT
I-24-4983 - Plaza Improvements
Bids Due in 11 days
Illinois Tollway
The location of the services to be performed for this contract is the Reagan Memorial Tollway (I-88) between Mile Post 124.8 to Mile Post 134.3 in DuPage County, Illinois
The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; barrier wall construction; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic.
Bids Due in 4 days
6/20/25 10:30am CDT
I-25-2014 - ATM System ITS Device & Fiber Installation
Bids Due in 4 days
Illinois Tollway
The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 33.6 and Mile Post 40.0 in Cook County, Illinois.
The scope of the work shall consist of installation of Intelligent Transportation System (ITS) equipment at the Intermediate Power Distribution and Communication (IPDC) facility buildings; installation of ITS equipment cabinets, Closed Circuit Television (CCTV) cameras, Vehicle Detection Systems (VDS), Ramp Detection and ITS galvanized steel poles; electrical work to operate the ITS equipment; removal of existing ITS equipment; fiber optic communication cable and network switch installation; maintenance of traffic, and other miscellaneous work.
Bids Due in 4 days
6/20/25 10:30am CDT
I-25-2016 - Landscape Planting Improvements
Bids Due in 4 days
Illinois Tollway
The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 23.1 and Mile Post 24.5 in Cook County, Illinois
The scope of the work shall consist of planting of trees and shrubs, maintenance and monitoring of trees and shrubs during the initial planting and establishment periods, weed control, erosion and sediment control, and maintenance of traffic operations
Bidding Closed
6/6/25 10:30am CDT
I-25-2017 - Landscape Planting Improvements
Bidding Closed
Illinois Tollway
The location of the services to be performed for this contract is the Tri-State Tollway (I-294) between Mile Post 17.7 and Mile Post 23.1 in Cook County, Illinois.
The work under this contract includes planting of trees and shrubs, maintenance and monitoring of trees and shrubs during the initial planting and establishment periods, mowing, weed control, tree and brush removal, pruning and mulching, erosion and sediment control, and maintenance of traffic operations
Bids Due in 39 days
7/25/25 10:30am CDT
I-25-4991 - Plaza Improvements
Bids Due in 39 days
Illinois Tollway
The location of services to be performed is the Reagan Memorial Tollway (I-88) between Mile Post 114.5 to Mile Post 119.4 in Kane County, Illinois
The scope of the work shall consist of ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; barrier wall construction; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic
ROCIP Insurance Manual & FAQ
Illinois Tollway
RR-23-4920R - Design-Build (Notice of Intent)
Illinois Tollway
The Illinois Tollway hereby informs industry via this Notice of Intent (“NOI”) of an upcoming Request for Qualifications (“RFQ”) solicitation associated with pavement and structural preservation and rehabilitation, and drainage improvements on Illinois Route 390 Tollway between Mile Post 6.0 (US Route 20/Lake St) to Mile Post 13.0 (I-290/Eisenhower Expressway). The Project is anticipated to be delivered under a Design-Build contract.