I-18-4430 - Roadway & Bridge Reconstruction

The work under this Contract shall consist of: The reconstruction of portions of I-294 mainline, bridge replacement of bridge number 191 carrying northbound I-294 over CNRR, I&M Canal, Chicago Sanitary & Ship Canal, MWRD Property, Cook County Forrest Preserve, Des Plaines River, BNSF RR, Santa Fe Drive, and the 75th Street Ramps, replacement of portions of bridge numbers 183 and 184 carrying I-294 over LaGrange Road, reconstruction of portions of the 75th Street ramps, performance based noise and retaining walls, cofferdams and causeways, detention pond and other drainage improvements, temporary soil retention, fire protection system, demolition of structures, protective shield, temporary erosion and sediment control, and Maintenance of Traffic

Status

Accepting Bids

Prebid Date2/14/19 1:00 pm

Bid Date3/14/19 10:30 am

Company & Contacts

Illinois Tollway

Mohamad Faraj (mfaraj@getipass.com)   630-241-6800

Location

The work under this Contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 20.7 and Mile Post 22.3 in Cook County, Illinois.

Questions pertaining to the intent of the Contract Documents may be sent to the Illinois Tollway, attention Mohamad Faraj at mfaraj@getipass.com, to be received no later than 2:00 p.m. local time on February 28, 2019

BID DUE DATE:
Thursday, March 14, 2019 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Thursday, February 14, 2019 – 1:00PM
Aramark Conference Center – Auditorium
2300 Warrenville Rd., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence