I-19-4507 - Shoulder Rehabilitation, Retaining Wall & Noise Abatement Wall Construction

The work under this contract includes, but is not limited to Maintenance of Traffic; Temporary Lighting Improvements; Permanent and Temporary Drainage Improvements; Pavement Removal; Construction of Mainline and Ramp Pavement and Crossovers; Construction of Soil Nail Walls for BN 185 and BN 187; Removal of Existing Noise Abatement Walls; Construction Noise Abatement Wall PR-TS22.90N, NB; Earthwork and Grading; and Relocate Temporary ITS. Performance Based Noise Abatement Wall (Precast Concrete) and Soil Nail Walls will require design by the contractor as it is included in this contract as a performance specification.

Status

Accepting Bids

Prebid Date2/11/20 10:30 am

Bid Date3/3/20 10:30 am

Company & Contacts

Illinois Tollway

Jeffrey Allen (jallen@getipass.com)  

Location

The work under this contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 22.3 and Mile Post 24.1 in Cook County, Illinois (Cook County)

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention jallen@getipass.com, to be received no later than 2:00 p.m. local time on February 12, 2020

BID DUE DATE:
Tuesday, March 3, 2020 – 10:30AM
Illinois Tollway – Central Administration Building
2700 Ogden Ave., Downers Grove, IL 60515

PRE-BID MEETING: (OPTIONAL)
Tuesday, February 11, 2020 – 10:30AM
Illinois Tollway – Central Administration Building
Conference Room 175
2700 Ogden Ave., Downers Grove, IL 60515

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence