I-20-4512 - Advance Fiber Relocation Installation

The work under this contract shall consist of: Installing dry jack and bored steel casing under Union Pacific Railroad; Installing underground conduit duct bank; Proofing existing underground conduit duct bank; Installing fiber optic cables; Connecting existing temporary ITS devices to proposed fiber optic cable; Maintenance of existing ITS devices; Removing existing ITS devices; Erosion control; and Maintenance of Traffic.
  Addendum #1 (click to expand/collapse)
Name Size
I-20-4512_Addendum1 2.1 MB