I-20-4512 - Advance Fiber Relocation Installation

The work under this contract shall consist of: Installing dry jack and bored steel casing under Union Pacific Railroad; Installing underground conduit duct bank; Proofing existing underground conduit duct bank; Installing fiber optic cables; Connecting existing temporary ITS devices to proposed fiber optic cable; Maintenance of existing ITS devices; Removing existing ITS devices; Erosion control; and Maintenance of Traffic.
  00_A-1 Page (click to expand/collapse)
Name Size
I-20-4512_A-1-Page_03052020 105.8 KB
  01_P-Pages (click to expand/collapse)
Name Size
I-20-4512_P-Pages_03052020.xlsx 436.3 KB
  02_Specifications (click to expand/collapse)
  03_Geotech - CADD Files (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
4656-align.dgn 1.2 MB
4656-exrow.dgn 294.5 KB
4656-prrow.dgn 559.5 KB
4656-topo.dgn 6.5 MB