I-19-4496 - Roadway & Bridge Reconstruction

Status

Accepting Bids

Prebid Date5/4/20 10:00 am

Bid Date6/19/20 10:30 am

Company & Contacts

Illinois Tollway

Michael Wicks (mwicks@getipass.com)  

Location

The work under this contract is to be performed on: Tri-State Tollway (I-294) Ramp J from South of I-88 to North of I-290 M.P. 31.5 to M.P. 34.9, in Dupage County and Cook County

The work under this contract shall consist of: Roadway and Bridge Reconstruction Tri-State Tollway (I-294) Ramp J from South of I-88 to North of I-290 M.P. 30.9 to M.P. 31.8, including: The reconstruction of portions of I-294 Ramp J, bridge rehabilitation of bridge number 209CD (Ramp J over I-88 and Ramp D), bridge reconstruction of bridge number 211CD (Ramp J over Butterfield Road) and 219CD (Ramp J over CC&P RR), and bridge construction of bridge number 221CD (Ramp J over I-290). Work also includes retaining wall repairs and construction, noise abatement wall construction, noise abatement wall removal, mechanically stabilized earth retaining wall removal, concrete retaining wall removal, utility protection for 90 inch watermain, drainage and utility improvements, intelligent transportation system (ITS) infrastructure, temporary and permanent lighting systems, erosion control measures and landscaping improvements, signing, and maintenance of traffic operations

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention mwicks@getipass.com, to be received no later than 2:00 p.m. local time on May 11, 2020

BID DUE DATE:
Friday, June 19, 2020 – 10:30AM
Electronic Bids ONLY via BidBuy

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Monday, May 4, 2020 – 10:00AM via WebEx

See Announcement posted under the Addenda Tab and under Documents on the details page

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence