I-18-4352 - Windsor Drive Bridge Replacement

The work under this Contract shall consist of: Complete removal of existing four span bridge and replace with two span bridge at Windsor Drive over the Tollway Connector Ramps M & N between I-88 & I-294, pavement removal, roadway pavement construction, grading & earth embankment, erosion control & landscaping, lighting, associated maintenance of traffic, and all other appurtenant and miscellaneous construction shown on the plans and as required by the Standard Specification and within Special Provisions

Status

Accepting Bids

Prebid Date7/23/20 9:00 am

Bid Date8/25/20 10:30 am

Company & Contacts

Illinois Tollway

4352D.4352_Questions@docs.e-builder.net  

Location

The location of services to be performed on the Windsor Drive bridge over Illinois Tollway Connector Ramps M & N between I-88 & I-294 in Oak Brook, Illinois. (DuPage).

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4352D.4352_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on July 30, 2020.

BID DUE DATE:
Tuesday, August 25, 2020 – PRIOR to 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Thursday, July 23, 2020 – 9:00AM
WebEx Link: https://illinois2.webex.com/illinois2/onstage/g.php?MTID=ee199a4777eb989f72cd7a9bf8fa24621
Event number: 133 657 8125
Event password: 4352

Video Address: https://1336578125@illinois2.webex.com
You can also dial 173.243.2.68 and enter your meeting number
Audio conference:
To receive a call back, provide your phone number when you join the event, or call the number below and enter the access code.
US Toll
+1-415-655-0003
Access code: 133 657 8125

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence