I-18-4352 - Windsor Drive Bridge Replacement

The work under this Contract shall consist of: Complete removal of existing four span bridge and replace with two span bridge at Windsor Drive over the Tollway Connector Ramps M & N between I-88 & I-294, pavement removal, roadway pavement construction, grading & earth embankment, erosion control & landscaping, lighting, associated maintenance of traffic, and all other appurtenant and miscellaneous construction shown on the plans and as required by the Standard Specification and within Special Provisions
  00_A-1 Page (click to expand/collapse)
Name Size
I-18-4352_A Page_07142020 122.6 KB
  01_P-Pages (click to expand/collapse)
Name Size
I-18-4352_P-Pages_06082020.xlsx 70.6 KB
  02_Specifications (click to expand/collapse)
  03_Geotech & Electronic Data Files (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
4117-eg.tin 10.0 MB
4117-pg.tin 9.9 MB
4117-pg.xml 17.5 MB
RP_KAS_MDM_4352-SturctureGeotechnicalReport_04292019 3.0 MB
  04_Pre-Bid Meeting Announcement (click to expand/collapse)
Name Size
I-18-4352_Pre-Bid Announcement 116.9 KB