I-20-4528 - Roadway Reconstruction

The work under this contract includes: reconstruction and realignment of Ramp S including a relocation of the gore with I-290; replacement of an overhead sign structure; drainage work including storm sewers, ditches, and detention pond grading; erosion and sediment control; and traffic control
  01_Plans (click to expand/collapse)
Name Size
I-20-4528_ContractPlans_Vol1 53.6 MB