RR-20-4552 - Structural Rehabilitation

The work under this contract includes mainline bridge joint work, median barrier removal and replacement, pavement patching, electrical work, maintenance of traffic and other miscellaneous work
  00_A-1 Page (click to expand/collapse)
Name Size
RR-20-4552_A-1 Page_12012020 133.5 KB
  01_P-Pages (click to expand/collapse)
Name Size
RR-20-4552_P-Pages_12092020.xlsx 69.0 KB
  02_Reference Drawings (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CIP-617 16.6 MB
CIP-619 14.8 MB
RR-16-4256 24.1 MB
  02_Specifications (click to expand/collapse)