RR-20-4556 - Landscape Planting Improvements

The scope of the work shall consist of but is not limited to: Planting of balled and burlapped and container grown, trees and shrubs, maintenance and monitoring of installed trees and shrubs during the planting and extended establishment period, seeding and inter-seeding, mowing for inter-seeding preparation and maintenance mowing, tree and shrub removal, weed control, pruning and mulching existing trees and shrubs, erosion and sediment control, and maintenance of traffic operations

Status

Accepting Bids

Prebid Date2/16/21 10:00 am

Bid Date3/18/21 10:30 am

Company & Contacts

Illinois Tollway

4255D.4556_Questions@docs.e-builder.net  

Location

The location of services to be performed on the Veterans Memorial Tollway (I-355) between MP 24.90 to 29.80 in DuPage County, IL

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention
4255D.4556_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on February 19, 2021.

BID DUE DATE:
Thursday, March 18, 2021 – 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Tuesday, February 16, 2021 – 10:00AM
Register and Join Event:
https://illinois2.webex.com/illinois2/onstage/g.php?MTID=e3431a68aa01ef3f7eec256338d8f7a49
Event number: 177 020 7991
Password: 4556

VideoAddress: https://1770207991@illinois2.webex.com
You can also dial 173.243.2.68 and enter your meeting number.

Audio conference: To receive a call back, provide your phone number when you join the event, or
call the number below and enter the access code.
US Toll
+1-415-655-0003
Access code: 177 020 7991

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence