RR-21-4589 - Weigh-In Motion Replacement- Tri-State Tollway (I-94)

The work under this contract includes, but is not limited to removal of existing WIM System, installation of a new VWIM site, installation of new WIM device poles (with IP cameras and over-height transmitters) and foundations (ground and median mounted), installation of new VWIM cabinet and associated sensors/loops, tying into existing transformer power source for power connectivity, installation of new frame mounted disconnect switches, installation of new conduit, power cables, junction boxes, and electric handholes, site restoration and other associated work, maintenance of traffic and removal & restoration of pavement containing existing WIM sensors.