RR-21-9247 - Traffic Operations Center & Dispatch Center Renovation - General/Coordinating

The scope of work shall consist of General/Coordinating Contractor. This contract includes renovation of the loading dock, money counting and vault areas in the lower level of the Central Administration Building. The renovated area will consist of a new Traffic Operations Center and Dispatch Center and support spaces.
00_A-1 Page (click to expand/collapse)
Name Size
RR-21-9247_A Page_01102022 80.6 KB
01_P-Pages (click to expand/collapse)
Name Size
RR-21-9247_P-Pages_12172021.xlsx 94.4 KB
02_Specifications (click to expand/collapse)
03_Reference (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
MIP-87-403_SET1_CONSTRUCTION 13.3 MB
MIP-87-403_SET2_CONSTRUCTION 7.2 MB