I-16-4669 - Roadway & Bridge Construction - IL 390 & I-490 Interchange

The work under this contract includes earthwork and grading construction, construction of six interchange flyover ramp bridges, retaining wall construction, pavement construction, storm sewer construction, lighting and Intelligent Transportation Services (ITS) construction, utility conduit and manhole construction, watermain construction, fire suppression system installation, erosion and sediment control, landscaping and traffic control and protection.

Status

Accepting Bids

Prebid Date4/10/24 11:00am CDT

Bid Date5/31/24 10:30am CDT

Company

Illinois Tollway

Location

The location of the services to be performed for this contract is the Elgin O'Hare Western Access Tollway (I-490) between Mile Post 3.2 and Mile Post 3.9 and Illinois Route 390 Tollway (IL 390) at Mile Post 17.0 in DuPage County, Illinois.

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention
4622D.4669_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on May 10, 2024.

BID DUE DATE:
Friday, May 31, 2024 - 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Wednesday, April 10, 2024 - 11:00AM
Via Microsoft Teams
Register & Join Event:
https://events.gcc.teams.microsoft.com/event/0978c8b3-bcad-4c57-ab1f-eb9b6262fcae@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 235 328 791 692
Passcode: pKsDEK

Audio Conference:
+1 323-486-3157,,994483355# United States, Los Angeles
Phone Conference ID: 994 483 355#

SITE VISIT: OPTIONAL
Thursday, April 11, 2024 - 10:00AM
Western Access Interchange (IL 390 & I-490)
100 Sievert Ct., Bensenville, IL 60106

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence