RR-25-2026 - Bridge Rehabilitation

The work under this contract includes bridge reconstruction, bridge rehabilitation, construction of new pavement and milling and overlaying existing pavement, guardrail removal and installation, earthwork, grading, erosion and sediment control measures and landscaping, drainage, Intelligent Transportation System (ITS) infrastructure, maintenance of traffic and other miscellaneous work.
01_A-1 Page (click to expand/collapse)
Name Size
RR-25-2026_A-1 Page_10152025 334.1 KB
02_P-Pages (click to expand/collapse)
Name Size
RR-25-2026_P-Pages_10172025.xlsx 95.4 KB
03_Specifications (click to expand/collapse)
04_Other Reports or As-Builts (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
E-3A 7.8 MB
E-3B 7.9 MB
E-4A 2.1 MB
GRE-85-349 3.0 MB
RR-07-5520 5.0 MB
RR-13-4142 893.2 KB
RR-13-5660R 485.8 KB
RR-15-5712_V1 12.5 MB
RR-15-5712_V2 30.6 MB
05_Electronic Data Files (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2026-motS01_I88at3MileBranch.dgn 600.0 KB
2026-motS01_I88atHowlandCreek.dgn 608.0 KB
2026-motS01_I88atUPRR.dgn 712.0 KB
2026-motS02_I88at3MileBranch.dgn 716.0 KB
2026-motS02_I88atHowlandCreek.dgn 536.0 KB
2026-motS02_I88atUPRR.dgn 528.0 KB
2026-rdyAlign_I88.dgn 708.0 KB
2026-utlPln_I88.dgn 532.0 KB