RR-25-2026 - Bridge Rehabilitation
The work under this contract includes bridge reconstruction, bridge rehabilitation, construction of new pavement and milling and overlaying existing pavement, guardrail removal and installation, earthwork, grading, erosion and sediment control measures and landscaping, drainage, Intelligent Transportation System (ITS) infrastructure, maintenance of traffic and other miscellaneous work.
01_A-1 Page
(click to expand/collapse)

Name | Size | |||
RR-25-2026_A-1 Page_10152025 | 334.1 KB |
02_P-Pages
(click to expand/collapse)

Name | Size | |||
RR-25-2026_P-Pages_10172025.xlsx | 95.4 KB |
03_Specifications
(click to expand/collapse)

Name | Size | ||
RR-25-2026_ContractBook_Vol1 | 3.2 MB | ||
RR-25-2026_ContractBook_Vol2 | 7.9 MB |
04_Other Reports or As-Builts
(click to expand/collapse)

Name | Size | |||
E-3A | 7.8 MB | |||
E-3B | 7.9 MB | |||
E-4A | 2.1 MB | |||
GRE-85-349 | 3.0 MB | |||
RR-07-5520 | 5.0 MB | |||
RR-13-4142 | 893.2 KB | |||
RR-13-5660R | 485.8 KB | |||
RR-15-5712_V1 | 12.5 MB | |||
RR-15-5712_V2 | 30.6 MB |
05_Electronic Data Files
(click to expand/collapse)

Name | Size | |||
2026-motS01_I88at3MileBranch.dgn | 600.0 KB | |||
2026-motS01_I88atHowlandCreek.dgn | 608.0 KB | |||
2026-motS01_I88atUPRR.dgn | 712.0 KB | |||
2026-motS02_I88at3MileBranch.dgn | 716.0 KB | |||
2026-motS02_I88atHowlandCreek.dgn | 536.0 KB | |||
2026-motS02_I88atUPRR.dgn | 528.0 KB | |||
2026-rdyAlign_I88.dgn | 708.0 KB | |||
2026-utlPln_I88.dgn | 532.0 KB |