RR-25-4996 - Bridge Rehabilitation

The scope of the work shall consist of bridge patching, bridge overlay, maintenance of traffic and other miscellaneous work.

Status

Accepting Bids

Prebid Date 9/22/25 2:00pm CDT
Bid Date 10/23/25 10:30am CDT

Company

Illinois Tollway

Location

The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 38.3 and Mile Post 39.3 in Cook County, Illinois.

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4849D.4996_Questions@docs.ebuilder.net to be received no later than 2:00 p.m. local time on October 2, 2025..

BID DUE DATE:
Thursday, October 23, 2025 - 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Monday, September 22, 2025 - 2:00PM
Via Microsoft Teams
Register & Join Event:
https://events.gcc.teams.microsoft.com/event/11f0ae92-cc4e-40a4-9805-47e4daf2bd56@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 232 378 511 100 6
Passcode: Jw242kF2

Audio Conference:
Call the number below and enter the access code.
United States, Los Angeles
+1-323-486-3157
Phone Conference ID: 406 566 56#

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence