RR-25-4996 - Bridge Rehabilitation

The scope of the work shall consist of bridge patching, bridge overlay, maintenance of traffic and other miscellaneous work.
01_A-1 Page (click to expand/collapse)
Name Size
RR-25-4996_A-1 Page_09112025 287.0 KB
02_P-Pages (click to expand/collapse)
Name Size
RR-25-4996_P-Pages_09122025.xlsx 81.6 KB
03_Specifications (click to expand/collapse)
04_As-Built Plans (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CIP-666_V1_R 30.8 MB
CIP-666_V2_R 8.2 MB
CIP-666_V3_R 8.7 MB
CIP-666_V4_R 32.1 MB
I-18-4389_R_V1_2023210 249.2 MB
I-18-4427_R_V1_2023214 154.2 MB
I-18-4427_R_V2_2023214 105.9 MB
I-18-4427_R_V3_2023214 84.6 MB
I-18-4427_R_V4_2023214 138.8 MB