RR-25-2023 - Bridge Rehabilitation
The scope of the work shall consist of a bridge deck overlay at BN 827; bridge rehabilitation work at BN 833, BN 851, BN 853, and BN 1471; incidental roadway and shoulder rehabilitation work; drainage, erosion and sediment control measures and landscaping; pavement marking; maintenance of traffic; and other miscellaneous work.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| RR-25-2023_Addendum1 | 4.7 MB |
Addendum #2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| RR-25-2023_Addendum2 | 293.8 KB |
Addendum #3
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| RR-25-2023_Addendum3 | 192.3 KB |
