RR-25-2023 - Bridge Rehabilitation

The scope of the work shall consist of a bridge deck overlay at BN 827; bridge rehabilitation work at BN 833, BN 851, BN 853, and BN 1471; incidental roadway and shoulder rehabilitation work; drainage, erosion and sediment control measures and landscaping; pavement marking; maintenance of traffic; and other miscellaneous work.
01_A-1 Page (click to expand/collapse)
Name Size
RR-25-2023_A-1 Page_10012025 143.4 KB
02_P-Pages (click to expand/collapse)
Name Size
RR-25-2023_P-Pages_10032025.xlsx 98.7 KB
03_Specifications (click to expand/collapse)
04_Other Reports or As-Builts (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
DW_DuDOT_2022_Section 21-BRREP-02-BR_Rehabilitation 8.1 MB
DW_IDOT_2019_61F83_Bridge Improvements 3.1 MB
DW_Tollway_1958_T-6A_Bridge Construction (Girders) 11.7 MB
DW_Tollway_1958_T-6A_V1_Bridge Construction 45.6 MB
DW_Tollway_1958_T-6A_V2_Bridge Construction 17.6 MB
DW_Tollway_1958_T-6A_V3_Bridge Construction 63.2 MB
DW_Tollway_1974_GRE-76-266_P1_Widening and Resurfacing 16.3 MB
DW_Tollway_1974_GRE-76-266_P2_Widening and Resurfacing 11.4 MB
DW_Tollway_1998_CIP-93-700P_P1_Roadway Expansion (MP 13.4 to 15.3) 25.2 MB
DW_Tollway_1998_CIP-93-700P_P2_Roadway Expansion (MP 13.4 to 15.3) 15.7 MB
DW_Tollway_1998_CIP-93-700P_P3_Roadway Expansion (MP 13.4 to 15.3) 22.2 MB
DW_Tollway_1998_CIP-93-700P_P4_Roadway Expansion (MP 13.4 to 15.3) 64.4 MB
DW_Tollway_1998_CIP-93-700P_P5_Roadway Expansion (MP 13.4 to 15.3) 67.3 MB
DW_Tollway_1998_CIP-93-700P_P6_Roadway Expansion (MP 13.4 to 15.3) 2.1 MB
DW_Tollway_1998_MIP-95-699_Bridge Replacement 3.9 MB
DW_Tollway_2000_MIP-95-737_Bridge Construction 3.1 MB
DW_Tollway_2000_MIP-97-899_Washington Street over East-West Tollway 2.8 MB
DW_Tollway_2001_CIP-93-700W_Bridge Widening 2.4 MB
DW_Tollway_2003_RR-03-5140_Bridge Removal and Replacement 6.9 MB
DW_Tollway_2004_RR-03-5179_V1_Roadway Reconstruction (MP 122.9 to 125.2) 74.3 MB
DW_Tollway_2004_RR-03-5179_V2_Roadway Reconstruction (MP 122.9 to 125.2) 48.5 MB
DW_Tollway_2008_I-08-5494_V1_Reconstruction and Widening (MP 131.9 to 137.0) 110.9 MB
DW_Tollway_2008_I-08-5494_V2_Reconstruction and Widening (MP 131.9 to 137.0) 112.3 MB
DW_Tollway_2008_I-08-5494_V3_Reconstruction and Widening (MP 131.9 to 137.0) 228.5 MB
DW_Tollway_2008_I-08-5494_V4_Reconstruction and Widening (MP 131.9 to 137.0) 227.6 MB
DW_Tollway_2008_I-08-5495_V1_1_Reconstruction and Widening (MP 131.9 to MP 137) 76.6 MB
DW_Tollway_2008_I-08-5495_V1_2_Reconstruction and Widening (MP 131.9 to MP 137) 46.9 MB
DW_Tollway_2008_I-08-5495_V2_1_Reconstruction and Widening (MP 131.9 to MP 137) 102.4 MB
DW_Tollway_2008_I-08-5495_V2_2_Reconstruction and Widening (MP 131.9 to MP 137) 40.1 MB
DW_Tollway_2008_I-08-5495_V3_1_Reconstruction and Widening (MP 131.9 to MP 137) 94.1 MB
DW_Tollway_2008_I-08-5495_V3_2_Reconstruction and Widening (MP 131.9 to MP 137) 59.7 MB
DW_Tollway_2008_I-08-5495_V4_1_Reconstruction and Widening (MP 131.9 to MP 137) 71.8 MB
DW_Tollway_2008_I-08-5495_V4_2_Reconstruction and Widening (MP 131.9 to MP 137) 130.1 MB
DW_Tollway_2017_RR-17-4312_R_V1_Pavement and Structure Preservation and Rehabilitation 28.9 MB
DW_Tollway_2017_RR-17-4313_R_V1_Pavement and Structural Preservation and Rehabilitation 36.5 MB
DW_Tollway_2017_RR-17-4313_R_V2_Pavement and Structural Preservation and Rehabilitation 16.7 MB
DW_Tollway_2018_RR-16-4255_V1_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 29.3 MB
DW_Tollway_2018_RR-16-4255_V2_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 48.4 MB
DW_Tollway_2018_RR-16-4255_V3_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 63.2 MB
DW_Tollway_2018_RR-16-4255_V4_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 37.7 MB
DW_Tollway_2018_RR-16-4255_V5_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 28.7 MB
DW_Tollway_2018_RR-16-4255_V6_Roadway and Bridge Rehabilitation (MP 12.1 to 22.3) 25.0 MB