RR-25-2023 - Bridge Rehabilitation
The scope of the work shall consist of a bridge deck overlay at BN 827; bridge rehabilitation work at BN 833, BN 851, BN 853, and BN 1471; incidental roadway and shoulder rehabilitation work; drainage, erosion and sediment control measures and landscaping; pavement marking; maintenance of traffic; and other miscellaneous work.
01_A-1 Page
(click to expand/collapse)

Name | Size | |||
RR-25-2023_A-1 Page_10012025 | 143.4 KB |
02_P-Pages
(click to expand/collapse)

Name | Size | |||
RR-25-2023_P-Pages_10032025.xlsx | 98.7 KB |
03_Specifications
(click to expand/collapse)

Name | Size | ||
RR-25-2023_ContractBook_Vol1 | 1.5 MB | ||
RR-25-2023_ContractBook_Vol2 | 2.3 MB |
04_Other Reports or As-Builts
(click to expand/collapse)
